It depends on equipment shortages and finally quality control checks. Generally that’s a good estimate and if things go well maybe 3 weeks. Should they have trouble acquiring a part, due to shortage, they will postpone delivery and working the product back through Final QC can be challenging as loads are matched on other products. That can extend the delivery for several weeks and it challenges all of our patience with the delay.
Those are usually new introduced parts that harder to come by due to demand. That is not common in the fall usually, though with new product introductions on graphs and Live equipment we have seen everything from Transducer Shield Savers to the actual cabling shortages effect delivery.
BCB